Quick answer
Tired of patching the same roof every spring? Get a brand-new, Class 4 hail-rated roof installed by Calgary's top-rated crew — with a 10-year workmanship warranty and manufacturer warranties up to 50 years.
Estimates by phone: (587) 804-9266 · Good Roofing · Calgary-owned since 2014 · 10-year workmanship warranty.
Replacing your roof is one of the largest renovations you'll ever do, and Calgary's hail-and-Chinook climate makes it one of the most important. Good Roofing has done more than 1,400 full re-roofs across Calgary since 2014. We're manufacturer-certified by IKO, Malarkey, Owens Corning and BP, and we install Class 4 impact-rated shingles by default — the only spec that actually makes sense in the hail belt.
01 · Section
What's included in a Good Roofing Calgary roof replacement
- 01Full tear-off down to the deck — no over-layering shortcuts
- 02Deck inspection & rotted-board replacement at no extra charge for the first 4 sheets
- 03Synthetic underlayment (not 15# felt) across the entire deck
- 04Ice & water shield 6 feet up from eaves, full valleys, around all penetrations
- 05New drip edge on every eave and rake
- 06Class 4 impact-rated shingles (IKO Nordic, Malarkey Vista AR, OC Duration Storm, BP Mystique)
- 07New step flashing at all wall and chimney intersections
- 08New roof vents, pipe boots, and ridge vents sized for proper attic ventilation
- 09Permit pulled and dump fees included in the quote — no surprises
- 10Manufacturer-certified install registered with the shingle maker for full warranty
- 11Final inspection + magnet sweep twice + your written 10-year workmanship warranty
02 · Section
How much does a roof replacement cost in Calgary?
- 01Smaller bungalows / townhomes: ~$7,500–$10,500
- 02Standard 2-storey single-family: $10,500–$15,500
- 03Larger or multi-tier 2-storey: $15,500–$22,000
- 04Cedar shake replacement: add 50–80%
- 05Standing-seam metal: roughly 2.0–2.5× asphalt
03 · Section
Why Calgary roofs need Class 4 impact-rated shingles
04 · Section
How long does the roof replacement take?
05 · Section
